VDOT News - Staunton
RELEASE: CONTACT: |
IMMEDIATE Sandy Myers 540-332-9201 Sandy.Myers@vdot.virginia.gov 540-292-2500 (cell) Ken Slack 540-332-9264 Ken.Slack@vdot.virginia.gov 540-414-5670 (cell) |
STA20-018 Feb. 14, 2020 |
TRAFFIC ALERT FOR FEBRUARY 17 – 21, 2020
Highway Work Zones in the Staunton District
STAUNTON – The following is a list of highway work that may affect traffic in the Staunton transportation district during the coming weeks. The Staunton District consists of 11 counties from the Alleghany Highlands to the northern Shenandoah Valley: Alleghany, Bath, Rockbridge, Highland, Augusta, Rockingham, Page, Shenandoah, Frederick, Clarke and Warren.
Scheduled work is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.
*NEW* or *UPDATE* indicates a new entry or a revised entry since last week’s report.
ALLEGHANY COUNTY
INTERSTATE 64
No lane closures reported.
PRIMARY ROADS
No lane closures reported.
SECONDARY ROADS
*NEW* Route 696 (Selma Low Moor Road) – Flagger traffic control as needed between I-64 and Route 616 (Rich Patch Road) for bridge replacement operations at Karnes Creek, 8 a.m. to 5 p.m. through April 30. Estimated project completion in fall 2021.
Various roads – Flagger traffic control for skin patching, pipe replacements, ditch work, tree removal, shoulder repairs, and brush cutting at various locations. Weekdays from 8:30 a.m. to 4 p.m.
BATH COUNTY
PRIMARY ROADS
Various roads – Flagger traffic control for tree debris and brush removal. Weekdays from 8:30 a.m. to 4 p.m.
SECONDARY ROADS
No lane closures reported.
ROCKBRIDGE COUNTY
INTERSTATE 64
No lane closures reported.
INTERSTATE 81
*NEW* Mile marker 189 to 188, southbound – Right shoulder closure for guardrail work, Monday from 8 a.m. to 5 p.m.
PRIMARY ROADS
*NEW* Route 39 (Maury River Road) – Overnight alternating lane closures between Route 780 (Brattons Run) and Route 252 (Brownsburg Turnpike) for debris removal, Tuesday and Wednesday from 12 midnight to 8 a.m.
*NEW* Route 39 (Maury River Road) – Overnight alternating lane closures between Route 11 (North Lee Highway) and Route 252 (Brownsburg Turnpike) for debris removal, Thursday and Friday from 12 a.m. to 8 a.m.
*UPDATE* Route 130 (Wert Faulkner Highway) – Alternating lane closures between Route 772 and Route 1304 (Sherwood Lane) for maintenance of the bridge over Route 688 (Stoner Hollow Road) and Crawford Creek. Monday to Friday from 7 a.m. to 5 p.m.
Various roads – Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs and brush cutting. Weekdays from 8:30 a.m. to 4 p.m.
SECONDARY ROADS
Various roads – Flagger traffic control for pipe replacement, ditch work, tree removal, shoulder repairs and brush cutting. Weekdays from 8:30 a.m. to 4 p.m.
HIGHLAND COUNTY
PRIMARY ROADS
Various roads – Flagger traffic control for brush cutting and shoulder repairs. Weekdays from 8:30 a.m. to 4 p.m.
SECONDARY ROADS
Various roads – Flagger traffic control for brush cutting and ditch work, weekdays from 8:30 a.m. to 4 p.m.
AUGUSTA COUNTY
INTERSTATE 64
No lane closures reported.
INTERSTATE 81
No lane closures reported.
PRIMARY ROADS
*UPDATE* Route 11 (Lee-Jackson Highway) – Southbound right shoulder closure for waterline installation between Route 1402 (First Street) and Hilltop Terrace Road, 8 a.m. to 5 p.m. through February 19.
SECONDARY ROADS
Route 710 (Mill Lane) – Flagger traffic control for Rural Rustic Road improvements between Route 252 (Middlebrook Road) and Route 700 (Sugar Loaf Road), weekdays from 8 a.m. to 4:30 p.m. through March 2020.
Route 794 (Sangers Lane) – Flagger traffic control for drainage and safety improvement project between Route 642 (Barrenridge Road) and 0.5 miles west of Route 642, weekdays from 8 a.m. to 4:30 p.m. through June 2020.
Various roads – Mobile work zones in the Swoope, Craigsville, Verona, Fishersville and Mint Springs areas for pothole patching, brush cutting and grading non-hard surface roads. Weekdays from 8 a.m. to 4 p.m. through March 2020.
ROCKINGHAM COUNTY
INTERSTATE 81
Mile marker 241 to 246, northbound and southbound – Brief slow roll closure (15 minutes or less) for installation of overhead utility lines, Sunday (February 16) between 7:30 a.m. and 10:30 a.m. Law enforcement will assist with traffic control.
Mile marker 256 to 259, northbound and southbound – Both shoulders closed 24/7 due to bridge replacement work at exit 257. Estimated completion in spring 2021.
PRIMARY ROADS
Route 33 (East Market Street, Harrisonburg) – Overnight alternating lane closures eastbound and westbound for soil testing between South Carlton Street and the I-81 interchange. Sunday to Thursday nights from 9 p.m. to 6 a.m. until March 27.
SECONDARY ROADS
Route 921 (Lairs Run Road) – Shoulder closures and occasional brief lane closure just west of Route 259 (Brocks Gap Road) for replacement of bridge over North Fork Shenandoah River, 7 a.m. to 5:30 p.m. through March 6. Estimated project completion September 2020.
PAGE COUNTY
PRIMARY ROADS
No lane closures reported.
SECONDARY ROADS
No lane closures reported.
SHENANDOAH COUNTY
INTERSTATE 81
*NEW* Mile marker 283 to 284, northbound – Overnight right shoulder closure for guardrail repairs, 7 p.m. Monday to 7 a.m. Tuesday.
PRIMARY ROADS
*NEW* Route 11 (North Massanutten Street, Strasburg) – Flagger traffic control between Thompson Street and Crystal Lane for curb/gutter construction, 9 a.m. to 3:30 p.m. through Friday.
Route 11 (Old Valley Pike) – Northbound and southbound alternating lane closures near intersections with Route 601 (Battlefield Road/Funk Road) for maintenance to the structure over Tumbling Run, Monday to Friday from 7 a.m. to 5 p.m.
SECONDARY ROADS
Various roads – Flagger traffic control for utility tree trimming. Monday through Friday during daylight hours.
FREDERICK COUNTY
INTERSTATE 81
*UPDATE* Mile marker 312 to 313, northbound and southbound –Northbound right lane closed from 8 p.m. to 7 a.m. on Monday and Wednesday nights. Shoulders closed both directions 24/7. Traffic restrictions are for bridge construction over I-81. Changeable message boards will advise motorists of schedule changes if necessary. Work zone speed limit 60 mph.
PRIMARY ROADS
*NEW* Route 11 (Valley Pike) – Flagger traffic control between Route 638 (Vaucluse Road) and Route 735 (Salem Church Road) for brush removal, Tuesday to Friday from 8 a.m. to 2:30 p.m.
Route 11 (Valley Pike) – Lane or shoulder closures as needed just south of Stephens City town limits for turn-lane construction, 7:30 a.m. to 5 p.m. through May 2020.
Route 50 (Northwestern Turnpike) – Eastbound and westbound single lane closures for bridge maintenance of various structures between Route 752 (Knob Road) and Route 614 (Back Mountain Road), Monday to Friday from 7 a.m. to 5 p.m.
*NEW* Route 522 (Front Royal Pike) – Southbound right shoulder closures for utility work between Route 776 (Bufflick Road) and Route 644 (Papermill Road), Tuesday and Wednesday from 8 a.m. to 3:30 p.m.
Route 522 (North Frederick Pike) – Northbound right shoulder and turn lane closures for utility work between Winchester city limits and Route 739 (Fox Drive), 7 a.m. to 6 p.m. through February 28.
Route 522 (Front Royal Pike) – Southbound right shoulder closures for turn lane installation between Route 644 (Papermill Road) and Route 644 (West Parkins Mill Road), 8 a.m. to 4:30 p.m. through April 2020.
SECONDARY ROADS
Route 655 (Sulphur Springs Road) – Flagger controlled traffic as needed for roadway reconstruction between Route 50 (Millwood Pike) and Route 656 (Greenwood Road). Flagging may also take place on Route 656 near the intersection with Route 655. Monday to Friday from 9 a.m. to 3 p.m. Estimated project completion July 2020.
Various roads – Flagger traffic control for utility tree trimming. Monday through Friday during daylight hours.
CLARKE COUNTY
PRIMARY ROADS
No lane closures reported.
SECONDARY ROADS
Route 601 (Blue Ridge Mountain Road) – Flagger traffic control between Route 50 (John Mosby Highway) and Route 7 (Harry Byrd Highway) for utility work. 7:30 a.m. to 5 p.m. through February 28.
Various roads – Flagger traffic control for utility tree trimming. Monday through Friday during daylight hours.
WARREN COUNTY
INTERSTATE 66
*NEW* Mile marker 14 to 13, westbound– Left shoulder closure for guardrail maintenance, Tuesday from 7 p.m. to 9 p.m.
INTERSTATE 81
No lane closures reported.
PRIMARY ROADS
No lane closures reported.
SECONDARY ROADS
Route 613 (Bentonville Road) – Northbound right shoulder closures for utility work at various locations between Route 340 (Stonewall Jackson Highway) and Route 730 (Shangri-La Road), 9 a.m. to 3 p.m. through February 27.
Various roads – Flagger traffic control for utility tree trimming. Monday through Friday during daylight hours.
Vegetation management may take place district wide on various routes. Motorists are reminded to use extreme caution when traveling through work zones.
Traffic alerts and traveler information can be obtained by dialing 511. Traffic alerts and traveler information also are available at http://www.511Virginia.org.
The VDOT Customer Service Center can assist with reporting road hazards, asking transportation questions, or getting information related to Virginia’s roads. Call 800-FOR- ROAD (800-367-7623) or use its mobile friendly website at https://my.vdot.virginia.gov/. Agents are available 24 hours-a-day, seven days a week.
The Staunton District Twitter feed is at @VaDOTStaunton. VDOT can be followed on Facebook, Flickr, Twitter and YouTube. RSS feeds are also available for statewide information. The VDOT Web page is located at http://www.VirginiaDOT.org.
(END)
Tweet
Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.