VDOT News - Northern Virginia

RELEASE:

CONTACT:
IMMEDIATE

Michelle Holland 703-586-0487
Michelle.Holland@vdot.virginia.gov

NOVA-182863

Aug. 17, 2021



Overnight Closures and Traffic Stoppages on I-66 West in Centreville August 17-21 for Overhead Bridge Work at Route 28

FAIRFAX – Overnight lane closures and traffic stoppages on I-66 West approaching Route 28 in Centreville are planned August 17-21 for overhead bridge work on a new Route 28 South bridge over I-66. This work is part of the Transform 66 Outside the Beltway Project.

Drivers should expect delays if traveling in this area and should consider using alternate routes.

Details include:

Tuesday, August 17, through Saturday, August 21

I-66 West from Stringfellow Road to Route 28

  • I-66 West will be reduced to one travel lane approaching Route 28 Tuesday through Thursday nights from 9 p.m. to 5 a.m., and Friday and Saturday nights from 9 p.m. to 9 a.m.
  • Drivers should expect periodic stoppages of up to 20 minutes during the overnight hours.
  • All lanes will reopen by 5 a.m. weekdays, and by 9 a.m. weekends.

All work is weather dependent and will be rescheduled if inclement conditions occur.

The Route 28 Interchange is being reconstructed to improve traffic flow on I-66 and Route 28, and provide access to and from the future I-66 Express Lanes. The I-66 Outside the Beltway Express Lanes from I-495 to Route 29 in Gainesville are expected to open in December 2022.

Construction and lane closure updates are available at Transform66.org and on Twitter @VaDOTNOVA. To receive project updates automatically by email, sign up here.   

###



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: May 19, 2023