VDOT News - Northern Virginia
RELEASE: CONTACT: |
IMMEDIATE Ellen Kamilakis 703-638-2595 |
NR21-020 March 31, 2021 |
Joplin Road Bridge to Reopen April 2
Bridge reconstruction in Quantico complete after extensive flood damage
QUANTICO – The Joplin Road bridge over Quantico Creek will reopen to through traffic on Friday, April 2, according to the Virginia Department of Transportation. The bridge was completely rebuilt after historic flooding on Aug. 13 required its closure.
The flood was the highest peak flow that the United States Geological Survey (USGS) gauge adjacent to the bridge had seen in its 69-year existence- classifying it as between a 100 and 200 year event.
Lane Construction was awarded a $932,000 emergency contract for repairs. The work included undergrounding of NOVEC power lines, as well as:
- Removal of the center pier
- Construction of new abutments, wing walls, and parapets
- Replacement of bridge beams and bridge deck (superstructure)
- Repair of bridge asphalt approaches
- Installation of new guardrail
Follow VDOT Northern Virginia on Twitter: @vadotnova
END
Tweet
Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.