VDOT News - Northern Virginia
RELEASE: CONTACT: |
IMMEDIATE Michelle Holland 703-586-0487 Michelle.Holland@vdot.virginia.gov |
NOVA-183963 Oct. 8, 2021 |
Full Closure of I-66 West at I-495 Next Week, October 12-14, for Overhead Bridge Work at I-66/I-495 Interchange
UPDATE (10/13/2021): The hours for the full closures of I-66 West at I-495 and the ramp from I-495 North to I-66 West have been extended for tonight, Wednesday, October 13, until 4:30 a.m. Thursday.
FAIRFAX – All lanes of I-66 West approaching Route 7 (Leesburg Pike) will close nightly October 12-14 for continued bridge beam installation at the I-66/I-495 Interchange. Traffic will be detoured using Route 7 and I-495. The ramp from I-495 North to I-66 West, as well as the 495 Express Lanes North, and multiple lanes of I-495 North approaching I-66 will also be closed so that this work may be implemented.
Drivers traveling on I-66 and I-495 during this time should expect delays and should consider using alternate routes.
Crews are installing beams for a new flyover ramp from I-495 North to I-66 West as part of the Transform 66 Outside the Beltway Project.
Details include:
Tuesday, October 12, through Thursday, October 14
I-66 West at I-495
- Starting at 9 p.m. two lanes will be closed each night.
- Between 11 p.m. and 4 a.m. nightly, all I-66 West travel lanes will be closed at Route 7 (Leesburg Pike).
- All I-66 West traffic will be directed to exit the interstate to Route 7 West (toward Tysons), travel about one mile to I-495 South, and then follow signs to I-66 West.
- All lanes will reopen by 5 a.m.
Ramp from I-495 North to I-66 West
- The ramp will be closed from 11 p.m. to 4 a.m. each night.
- Traffic will be directed to continue north to Route 7 West, stay to the right to I-495 South, and then exit to I-66 West.
- The ramp will reopen by 4 a.m.
I-495 North from Route 29 (Lee Highway) to I-66
- Starting at 9 p.m., two lanes approaching I-66 will be closed nightly.
- Between 10:30 p.m. and 5 a.m. each night, northbound I-495 will be reduced to a single travel lane.
- Drivers should expect periodic short stoppages during the overnight hours.
- All lanes will reopen by 5 a.m.
495 Express Lanes North from Robinson Terminal to I-66
- The 495 Express Lanes North will be closed from Robinson Terminal (the beginning of the Express Lanes) to I-66 from 10 p.m. to 5 a.m. each night.
- Overhead variable message boards will direct traffic to alternate routes.
All work is weather dependent and will be rescheduled if inclement conditions occur.
The I-66/I-495 Interchange is being modified with several new ramps and connections as part of the Transform 66 Outside the Beltway Project. Improvements at the interchange include adding access to and from the existing 495 Express Lanes and the new I-66 Express Lanes, as well as building new connections between express and general purpose lanes.
Construction and lane closure updates are available at Transform66.org and on Twitter @VaDOTNOVA. To receive project updates automatically by email, sign up here.
###
Tweet
Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.