VDOT News - Northern Virginia

RELEASE:

CONTACT:
IMMEDIATE

Michelle Holland Michelle Holland
Michelle.Holland@VDOT.Virginia.Gov

NOVA-155972

Jan. 16, 2020



Extended Overnight Closures of Route 28 Between Braddock Road and Westfields Boulevard Planned for the Week of Jan. 27
Closures necessary for girder installation for new Poplar Tree Road bridge over Route 28

UPDATE (1/30/20): LIFTS OVER ROUTE 28 NORTH FINISHED LAST NIGHT; ROUTE 28 SOUTH CLOSURES PLANNED FOR TONIGHT AND FRIDAY NIGHTS BETWEEN MIDNIGHT AND 5:30 A.M. (FEB 1 AND FEB 3 AS BACK-UP NIGHTS)

FAIRFAX – Bridge beam installation for the new Poplar Tree Road bridge over Route 28 will require closure of Route 28 between Braddock Road and Westfields Boulevard during the overnight hours Monday, Jan. 27, through Thursday, Jan. 30. Closures are planned for Route 28 North the first two nights, followed by Route 28 South the next two nights. Closures are needed to safely install bridge beams over the roadway and ramps. 

Drivers will be directed to follow signed detours and should expect delays. Work is weather dependent and will be rescheduled if inclement conditions occur.

Details include:  

Monday, Jan. 27 and Tuesday, Jan. 28:
Route 28 North between I-66 and Westfields Blvd.  

  • A single lane will close at 9 p.m.
  • Full closure of Route 28 North at Braddock Road from 11 p.m. to 4 a.m. Drivers will be directed to turn left on Braddock Road, then right on to Westfields Boulevard, then follow signs to Route 28 North. 
  • As an alternative, drivers on Route 28 North can take I-66 East to Route 286 (Fairfax County Parkway) North, follow signs to Route 50 West, then follow signs to Route 28 North. 
  • The ramp from I-66 West to Route 28 North and Braddock Road will be closed between 11 p.m. and 4 a.m. Drivers will be detoured to Route 29 Centreville, turn right at the traffic signal on to Route 29 South, then right on to Stone Road, continue on to Westfields Boulevard, then follow signs to Route 28 North.  
  • As an alternative, drivers on I-66 West can exit to Route 50 West or Route 286 (Fairfax County Parkway) North to reach Route 28 North. 
  • The ramp from I-66 East to Route 28 North will be closed between 11 p.m. and 4 a.m. Drivers will be detoured to Route 286 (Fairfax County Parkway) North, follow signs to Route 50 West, then follow signs to Route 28 North. 
  • All lanes will reopen by 5 a.m.

Wednesday, Jan. 29, and Thursday, Jan. 30:  
Route 28 South between Westfields Boulevard and I-66

  • A single lane will be closed at 9 p.m. 
  • Full closure of Route 28 South at Westfields Boulevard from midnight to 5 a.m. Drivers will be directed to Westfields Boulevard West, then turn left on to Braddock Road and follow signs to Route 28 South. 
  • As an alternative to reach I-66, drivers can use Route 50 East and Route 286 (Fairfax County Parkway) South. 
  • The ramp from Westfields Boulevard West to Route 28 South will be closed between midnight and 5 a.m. Drivers will be directed to continue west on Westfields Boulevard, then turn left on Braddock Road and follow signs to Route 28 South. 
  • The ramp from Westfields Boulevard East to Route 28 South will be closed between midnight and 5 a.m. Drivers will be directed to the ramp for Route 28 North, stay to the right for Westfields Boulevard West, continue farther west on Westfields Boulevard, then turn left on Braddock Road and follow signs to Route 28 South.
  • All lanes will reopen by 5 a.m.

Message boards on I-66 and Route 28 are providing advance notice of lane closures and traffic stoppages. Weekly updates are available at Transform66.org and on Twitter @VaDOTNOVA. To receive updates automatically by email, sign up here.   

On Twitter, follow VDOT Northern Virginia at @VaDOTNOVA

###



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Jan. 16, 2020