VDOT News - Northern Virginia
RELEASE: CONTACT: |
IMMEDIATE Michelle T. Holland 703-586-0487 Michelle.Holland@VDOT.Virginia.Gov |
NOVA-148869 Oct. 25, 2019 |
Traffic Pattern Changes Planned for I-66/Route 29 Interchange in Centreville Starting on or About October 28
Ramp from Route 29 South to I-66 West will close; Drivers will use new temporary left-turn lanes, traffic signal to access highway
FAIRFAX – A new traffic pattern will be implemented on or about Monday, October 28, at the I-66/Route 29 Interchange in Centreville for approximately 18 months. Traffic changes will include closing the ramp from Route 29 South to I-66 West, and installing new, temporary left-turn lanes at the existing traffic signal to allow drivers access to I-66 West. Changes are needed to rebuild the I-66 bridges over Route 29 to allow for future mass transit expansion along I-66 and future widening of Route 29 under the interstate.
Details include:
- The loop ramp from southbound Route 29 to I-66 West will close. Drivers will access I-66 West by using two new left turn-only lanes at the traffic signal slightly farther south that will join the existing ramp from northbound Route 29 to I-66 West.
- Drivers traveling north on Route 29 to the ramp to I-66 West should be alert for Route 29 South traffic entering the ramp from the left.
Drivers should expect construction-related detours and additional changes to traffic patterns as work progresses at the Route 29 interchange. Drivers are reminded to use caution and pay attention to lane markings and roadway signs in construction work zones.
When complete, the Transform 66 Outside the Beltway Project will feature three general purpose lanes and two Express Lanes in each direction from I-495/Capital Beltway to Route 29 in Gainesville. The I-66 Outside the Beltway Express Lanes are expected to open in December 2022.
On Twitter, follow VDOT Northern Virginia at @VaDOTNOVA
Traffic pattern changes at the I-66/Route 29 Interchange in Centreville beginning on or about October 28, 2019. Drivers traveling on Route 29 South will access I-66 West by turning left at the traffic signal and joining the ramp from Route 29 North to I-66 West
Tweet
Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.